Skip to main content

OUTAGE REPORTING: 903.583.2117 | 1.800.695.9020

Home
Menu

Fannin County Electric Cooperative has contracted with RMA Engineering, LLC (RMA Engineering) to perform utility pole safety inspection and maintenance services within our service territory.  RMA Engineering crews will be working in the area to evaluate the condition of Fannin County Electric Cooperative‐owned poles and to perform any necessary maintenance.  We ask that you allow RMA Engineering personnel access to all Fannin County Electric Cooperative facilities that are located within the utility easement that is on or adjacent to your property.  Once on‐site, the inspection process takes approximately 10‐30 minutes per pole but can occasionally extend up to two hours when extensive maintenance activities are required. We apologize for any inconvenience this important process may cause.  You may acquire more information about the RMA Engineering by visiting their website at www.rmaengineer.com. If you have any additional questions, please contact RMA Engineering at 785‐262‐4762. To view a map of the areas to be inspected this year, Click Here.

 

 

 

 

  • Home
  • About Us
    • About Touchstone Energy
    • Cooperative Principles
    • FCEC Tariff
    • Board of Directors Districts
    • FCEC Bylaws
    • Securitization for Winter Storm Uri
  • Member Sevices
    • New Accounts
    • Billing Options
    • Co-op Connections
    • Touchstone Energy Savings
    • Youth Tour
    • Usage Calculator
    • CareFlite Caring Heart Program
    • Distributed Generation
  • Forms and Applications
  • Outage Map
  • Contact Us
  • Scholarship Program

Solicitud Para Servicio Residencial

Solicitud Para Servicio Residencial
Contact Information
Solicitante Primario
Main Applicant Name
Direccion de Envio igual a la direccion Fisica?
Mailing address for bill statement
Upload requirements
  • One file only.
  • 10 MB limit.
  • Allowed types: gif, jpg, png, svg.
Sign above
Quiere Incluir un Co-Solicitante
Co-Applicant
Nombre de Co-Solicitante
Upload requirements
  • One file only.
  • 10 MB limit.
  • Allowed types: gif, jpg, png, svg.
Sign above
Medidor de Electicidad Presente?

Solicitante acorda ser miembro y respetar los articulos de incorporación, Estatutos, y tarifas de la cooperativa, incluyendo el índice de tarifas y reglas de servicio. La junta directiva de la cooperativa puede cambiar precios o tarifas en la forma prevista por la ley. Miembro otorgará a la cooperativa los servidumbres escritos satisfactoria a la cooperativa que sean necesario para los propósitos de la cooperativa incluyendo proveyendo servicio eléctrico a Miembro, otros miembros, o solicitantes de el sevicio eléctrico de la cooperativa. Se requiere acceso para obtener registros del medidor y mantenimientos de lineas y tambien para propositos del Miembro/Consumidor. El Miembro/Consumidor acorda que Fannin County Electric Co-op. puede instalar una cerradura si es que habra una cerca/portón con cerradura en esta localidad. Todos los solicitantes estan sujetos a una verificación de ID y revisión de informe de credito. Falsa, incorecta o incompleta información invalidará la solicitud hasta que las discrepancias sean resueltas.

Por favor permita hasta 3 dias laborales desde la fecha inicial prevista para conectar el servicio existente de la localidad.

NOS COMUNICAREMOS CON USTED POR TELÉFONO O CORREO ELECTRONICO PARA EL BALANCE TOTAL DE SUS CARGOS (QUE PODRIA INCLUIR UN DEPOSITO DE SEGURIDAD Y/O CARGO DE CONEXION), SU NUMERO DE CUENTA Y FORMA DE PAGO. UNA VEZ REALIZADO SU PAGO, PORFAVOR INFORME SU NUMERO DE IDENTIFICACIÓN DE LA TRANSACCIÓN DE PAGO PARA PROGRAMAR SUS SERVICIOS.

Terminos del Acuerdo
Acuerdo
Al hacer clic en “Estoy de acuerdo” o enviando esta solicitud electrónicamente, usted afirma que usted está de acuerdo con los términos del presente documento y que está ejecutando esta solicitud y tiene la intención de adjuntar su firma electrónica a ella. Una vez aceptada por la Cooperativa, su solicitud presentada constituirá un contrato bajo la ley de Texas.
CAPTCHA

This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Back to Top

Quick Links

  • Contact Us
  • Bylaws
  • Tariff
  • Outage Map
  • Forms and Applications
  • Privacy Policy
  • Terms of Use

About Us

Fannin County Electric Cooperative, Inc is a non-profit rural electric utility cooperative headquartered in Bonham, Texas. Fannin County Electric has been serving the rural residents of Fannin, Grayson, Hunt, Lamar, and Collin Counties since 1937.

Contact Info

Main Office Location:  1530 Silo Rd. Bonham, TX 75418

Office Hours: Monday - Friday 8:00 AM - 5:00 PM

Phone: (903) 583-2117 | 1-800-695-9020

Fax: (903) 583-7384

Mailing Address: P.O. Box 250 Bonham, TX 75418

 

Follow Us Online

PoweringUp3.png

©2023 Fannin County Electric Cooperative. Owned By Those We Serve.

  • Home
  • About Us
    • About Touchstone Energy
    • Cooperative Principles
    • FCEC Tariff
    • Board of Directors Districts
    • FCEC Bylaws
    • Securitization for Winter Storm Uri
  • Member Sevices
    • New Accounts
    • Billing Options
    • Co-op Connections
    • Touchstone Energy Savings
    • Youth Tour
    • Usage Calculator
    • CareFlite Caring Heart Program
    • Distributed Generation
  • Forms and Applications
  • Outage Map
  • Contact Us
  • Scholarship Program